Mock Tudor boards in solid oak, 44mm thick, should last for generations. On this 1900s gable end they twisted, split and started to decay in a little over a century. The reasons are worth knowing if you’ve got a mock Tudor house: the boards stand proud of the wall and catch driving rain on their edges, and layers of old paint stop that moisture drying out again. Roger is back on site with Robert from Tiffin to see the repair, along with the loft insulation detail most jobs miss.

Six years of work on one house

Tiffin have been working on this house for five or six years. It was built between 1900 and 1910 to a very high standard for the period. The walls look like 9 inch solid brick, but they’re actually 9 inch solid brickwork, then a cavity, then another four and a half inch skin. The window frames are solid oak, and the Crittall windows have been renewed so well you wouldn’t know they aren’t original.

When the client bought the house, Tiffin carried out a condition survey alongside a chartered surveyor’s structural survey. It flagged possible damp at ground floor level and a lack of insulation throughout. Since then:

  • The cavity has been filled with blown expanded polystyrene bead, much of it drilled from inside because the inner leaf is the thinner one.
  • The pointing was repaired where needed, and Stormdry masonry protection cream went on the outside to stop penetrating moisture.
  • Behind the tile hanging, which on houses of this age usually has no insulation at all, the tiles came off and wood fibre went in between the battens before the tiles went back.
  • The low mono pitch roofs at first floor level were stripped and filled with 300mm of glass fibre quilt.
  • The eaves were insulated, the loft got at least 300mm and up to 400mm in places, and the ventilation was increased with around 50 to 60 tile vents round the building.

Why 44mm solid oak failed

The big gable end has original Tudor style embellishments in oak boards 44mm thick, about the same as an internal fire door. They’re on the south west corner of the building, fully exposed with nothing to shelter them from the weather, and over a hundred years they’ve weathered badly. Some have twisted and distorted, and one area had fungal decay at the back, which Robert identified as dry rot. It looks almost like foam or adhesive, but it isn’t.

Roger’s question was why solid oak rots here when 500 year old timber framed buildings survive with bare, untreated oak. Robert puts it down to two things. The boards stick out slightly from the wall, so they catch the weather on their edges and moisture gets in. And there are many layers of old fashioned paint on them, which trap that moisture inside instead of letting it dry out. One cross bearer stood proud and took much of the rain coming down the gable.

The window frames are fine. They’re only flaking on the surface and need preparing, sanding and refinishing. The oak bargeboards, also around 120 years old, have been weathered and redecorated many times but are still very sound.

Splice it or replace it?

The original plan was to cut out the decayed sections and splice in new oak. Once the boards came off, it was clear how much work that would be on timber that thick. The house is in a conservation area and splicing would have kept more of the original, but the time and specialist tools needed to do it well would have made it very expensive for the client. So Tiffin decided to renew the lot in English oak, at 30mm rather than 44mm, fixed with countersunk screws and oak pellets made to match the originals. Ply packing on the wall brings the new oak out to the right level.

Robert’s view is that it comes down to significance: how much does a particular detail matter to the heritage of the building? That should decide how far you go to save it. On a protected building, the conservation officers have the final word, and if you take on a listed building or one in a conservation area, you may need deep pockets.

Higher up, the rendered panels between the timbers are on expanded metal lath and have stayed sound. One panel was opened up because the battening behind it had decayed, so it gets new battens, new metal lath and fresh render.

The cold bridge round the edge of the loft

Many upstairs rooms have a horizontal ceiling, then a short sloping section, then the wall. That sloping bit, sometimes called a skeiling, is usually left uninsulated, which creates a cold bridge round the whole perimeter of the house. Robert calls it the duvet effect.

Tiffin stripped the tiles at the eaves so they could pack the skeiling with Rockwool, and pack the fascias and soffits while they were at it. The different coloured pointing on the verge shows where the tiles came off.

Insulation keeps the heat out as well

Six years on, the client has had the hottest summer since the work was done. They’re from Australia and know how to manage hot weather, closing the curtains and opening the windows at the right times of day, and with the insulation in, they kept the house cool without air conditioning.

Roger’s brother-in-law is the opposite case, with almost no loft insulation and a house that bakes in summer. Before reaching for air conditioning, 200mm or more of loft insulation is a good place to start. It saves energy in winter and keeps the heat out in summer.

Old sarking felt

The roof has old vapour closed sarking felt rather than a modern vapour open membrane. In theory that locks moisture in, but here it’s properly lapped, so any water that gets through the tiles runs down it and out at the bottom. It’s still doing its job.

As Robert puts it, maintain a house well, insulate it well, keep it dry and well decorated, and there’s no reason it can’t last another 200 years.

Key takeaways

  • Thick solid oak still fails when it sits proud of the wall and catches driving rain on its edges, and decades of old paint layers can stop that moisture drying back out.
  • Splicing in repairs keeps more original fabric, but on heavy 44mm oak the time and specialist kit can make full replacement better value for the client, even in a conservation area.
  • How much a detail matters to the heritage of the building should decide how far you go to save it, and on protected buildings the conservation officer has the final say.
  • The sloping section of ceiling where the roof meets the wall is usually left uninsulated, which creates a cold bridge around the whole perimeter of the house.
  • Loft and eaves insulation cuts heat gain in summer as well as heat loss in winter, so it’s worth doing before anyone reaches for air conditioning.
  • Old vapour closed sarking felt can still be doing its job if it’s properly lapped and sheds any water that gets past the tiles.

Frequently asked questions

Why do mock Tudor boards rot?

They usually stand slightly proud of the wall, so rain gets in at the edges, and old paint layers trap that moisture inside. Exposed elevations facing the prevailing weather suffer most.

Should you repair or replace rotten oak boards?

Splicing in new sections keeps more original fabric, but on heavy timber it can be very expensive. The deciding factor is how significant the detail is to the building, and on a protected building the conservation officer decides.

What is the cold bridge at the edge of the loft?

It’s the short sloping section of ceiling between the flat ceiling and the wall. It’s often left uninsulated, which leaves a cold strip round the edge of every upstairs room.