Building an extension Part 6 – Installing joists and steels

In Part 6 of The Extension series, which follows the build of a side and rear extension, we see the joists and steels slotted into position in preparation for the removal of a load bearing wall at the back of the house.

The wall is being knocked out to extend the existing kitchen and create a kitchen/diner on the ground floor and an additional bedroom on the first floor.

This episode includes:

  • Cutting joists to fit the steel beam
  • Spacing the joists out with noggings and the challenges associated installing joists and steels.
  • Using Strongboys to support the outer and inner skin at the same time
  • Trimming the existing floor joists so they can sit in the web of the steel beam
  • Cutting out the brickwork
  • Lining up the holes of the two steel beams
  • Bolting timber on to the steel beam for the jiffy hangers
  • Expansion joints
  • Insulation
  • Using jiffy haners/joist hangers

This episode features products from: Evolution; Snickers Workwear; Milwaukee; Fein; Bosch; Arbotech; Stabila; Ecotherm; Teco and Rhino Scaffolding.

 

About Roger Bisby

Roger Bisby is an English television presenter and journalist, known for his expertise in the British building industry.

Check Also

quick diy plaster patching to fix damaged walls youtube thumbnail

Quick DIY Plaster Patching to Fix Damaged Walls!

Roger shows you how to do a super easy patch plaster DIY job! 👇Materials used …