Screeding And Plastering The Extension
It’s 2007 and Roger and Steve get the screed down ready for the tiler, while G&E Plastering tackles the walls and ceiling on the 35A Extension.
It’s 2007 and Roger and Steve get the screed down ready for the tiler, while G&E Plastering tackles the walls and ceiling on the 35A Extension.
© SkillBuilder